Triple

T12683121
Position Surface form Disambiguated ID Type / Status
Subject General Motors global manufacturing system E302996 entity
Predicate instanceOf P0 FINISHED
Object manufacturing system C12036 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: manufacturing system
Context triple: [General Motors global manufacturing system, instanceOf, manufacturing system]
  • A. industrial production system
    An industrial production system is an organized arrangement of people, machines, materials, methods, and information designed to efficiently transform inputs into standardized goods or services at scale.
  • B. manufacturing network chosen
    A manufacturing network is an interconnected system of facilities, suppliers, technologies, and logistics that collaboratively plan, produce, and distribute goods across multiple locations.
  • C. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • D. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • E. production facility
    A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdee64a08190801c6d470aefd723 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:21 p.m.