Triple

T12680177
Position Surface form Disambiguated ID Type / Status
Subject Moses und Aron E302923 entity
Predicate actStatus P106250 FINISHED
Object two acts fully orchestrated LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: two acts fully orchestrated | Statement: [Moses und Aron, actStatus, two acts fully orchestrated]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: actStatus
Context triple: [Moses und Aron, actStatus, two acts fully orchestrated]
  • A. actualStatus
    Indicates the current, real-world state or condition of an entity, as opposed to a planned, expected, or nominal status.
  • B. activationStatus
    Indicates whether an entity is currently active, enabled, or in effect within a given context.
  • C. status
    Indicates the current condition, state, or standing of an entity within a given context.
  • D. agencyStatus
    Indicates the current operational or legal condition under which an agency or agent is functioning (e.g., active, inactive, suspended, or terminated).
  • E. associatedStatus
    Indicates that one entity is linked to or characterized by a particular status or condition.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdee64a08190801c6d470aefd723 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d961b32dbc81908101fc5f07e26ed3 completed April 10, 2026, 8:46 p.m.
PD Predicate disambiguation batch_69d960bb64ec8190bd0400cf0cc8b0a7 completed April 10, 2026, 8:42 p.m.
PDg Predicate description generation batch_69d961acadb8819098de743bc951fedb completed April 10, 2026, 8:46 p.m.
Created at: April 9, 2026, 5:21 p.m.