Triple

T12676135
Position Surface form Disambiguated ID Type / Status
Subject Ponnji E302815 entity
Predicate hasBridge P386 FINISHED
Object Atal Setu E389449 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atal Setu | Statement: [Ponnji, hasBridge, Atal Setu]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atal Setu
Context triple: [Ponnji, hasBridge, Atal Setu]
  • A. Atal Setu (new Zuari Bridge) chosen
    Atal Setu, also known as the new Zuari Bridge, is a modern cable-stayed road bridge in Goa, India, that forms a key part of the state’s highway infrastructure.
  • B. Setu Bharatam
    Setu Bharatam is an Indian government initiative aimed at making national highways safer and more efficient by replacing level crossings with rail over-bridges and improving bridge infrastructure across the country.
  • C. Janki Setu
    Janki Setu is a pedestrian suspension bridge over the Ganges River in Rishikesh, India, serving as a key crossing and pilgrimage route.
  • D. Nivedita Setu
    Nivedita Setu is a modern cable-stayed bridge in West Bengal, India, named after Sister Nivedita and serving as a key roadway link near Kolkata.
  • E. Jal Marg Vikas Project
    Jal Marg Vikas Project is an Indian government initiative to develop and modernize inland waterways infrastructure, particularly National Waterway-1 on the Ganga, to enable efficient, large-scale cargo and passenger transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdee64a08190801c6d470aefd723 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d961b0d9c88190a05d6cbcb7a1642d completed April 10, 2026, 8:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69f671a341288190822fae2469efea09 completed May 2, 2026, 9:50 p.m.
Created at: April 9, 2026, 5:20 p.m.