Triple
T12666663
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fuxing series EMU |
E302568
|
entity |
| Predicate | familyMember |
P566
|
FINISHED |
| Object | CR400BF-C |
E997698
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CR400BF-C | Statement: [Fuxing series EMU, familyMember, CR400BF-C]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: CR400BF-C Context triple: [Fuxing series EMU, familyMember, CR400BF-C]
-
A.
CR400BF
chosen
The CR400BF is a high-speed electric multiple unit train in China’s Fuxing series, designed for rapid, efficient passenger service on the country’s modern rail network.
-
B.
CR400AF
CR400AF is a high-speed electric multiple unit train in China’s Fuxing series, designed for rapid intercity passenger service on the country’s modern high-speed rail network.
-
C.
CRH380C
The CRH380C is a high-speed electric multiple unit train used in China’s railway network, designed for rapid passenger service at speeds of up to around 380 km/h.
-
D.
CRH380B
The CRH380B is a high-speed electric multiple unit train used in China’s railway network, designed for rapid intercity passenger service at speeds up to around 380 km/h.
-
E.
CRH380D
The CRH380D is a high-speed electric multiple unit train used in China, designed for rapid intercity passenger service at speeds of up to around 380 km/h.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bded71a88190bb76e2413af9ea66 |
completed | April 9, 2026, 2:55 p.m. |
| NER | Named-entity recognition | batch_69d96181c40481908f3e2717f5472b85 |
completed | April 10, 2026, 8:45 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f6c0dace788190bf2663984801f38c |
completed | May 3, 2026, 3:28 a.m. |
Created at: April 9, 2026, 5:19 p.m.