Triple
T12666660
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fuxing series EMU |
E302568
|
entity |
| Predicate | familyMember |
P566
|
FINISHED |
| Object | CR400AF-G |
E996078
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CR400AF-G | Statement: [Fuxing series EMU, familyMember, CR400AF-G]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: CR400AF-G Context triple: [Fuxing series EMU, familyMember, CR400AF-G]
-
A.
CR400AF
chosen
CR400AF is a high-speed electric multiple unit train in China’s Fuxing series, designed for rapid intercity passenger service on the country’s modern high-speed rail network.
-
B.
CR400BF
The CR400BF is a high-speed electric multiple unit train in China’s Fuxing series, designed for rapid, efficient passenger service on the country’s modern rail network.
-
C.
CRH380A EMU
The CRH380A EMU is a high-speed electric multiple unit train used in China’s railway network, designed for rapid intercity passenger service at speeds of up to around 380 km/h.
-
D.
CRH6A EMU
The CRH6A EMU is a high-speed electric multiple unit train used in China for intercity passenger services.
-
E.
CRH
CRH is the commonly used abbreviation for the Cambridge Redhawks, a Canadian junior ice hockey team based in Cambridge, Ontario.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bded71a88190bb76e2413af9ea66 |
completed | April 9, 2026, 2:55 p.m. |
| NER | Named-entity recognition | batch_69d96181c40481908f3e2717f5472b85 |
completed | April 10, 2026, 8:45 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f6a53c03248190bd16ebaed9958815 |
completed | May 3, 2026, 1:30 a.m. |
Created at: April 9, 2026, 5:19 p.m.