Triple
T12656957
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ASTM C618 |
E302309
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | construction materials standard |
C2538
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: construction materials standard Context triple: [ASTM C618, instanceOf, construction materials standard]
-
A.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
-
B.
cement standard
A cement standard is a defined specification or guideline that establishes the required properties, performance criteria, and testing methods for cement to ensure quality, safety, and consistency in construction applications.
-
C.
building material
A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
-
D.
materials specification
A materials specification defines the required types, properties, standards, and quality criteria for materials to be used in a product, component, or construction.
-
E.
engineering standard
chosen
An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bded71a88190bb76e2413af9ea66 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:18 p.m.