Triple

T12642816
Position Surface form Disambiguated ID Type / Status
Subject Hōshō-class aircraft carrier E301940 entity
Predicate hasSingleCompletedUnit P3282 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Hōshō-class aircraft carrier, hasSingleCompletedUnit, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasSingleCompletedUnit
Context triple: [Hōshō-class aircraft carrier, hasSingleCompletedUnit, true]
  • A. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • B. isCompleteFor
    Indicates that one entity fully satisfies or finishes the requirements, scope, or intended purpose of another entity.
  • C. hasUnitStatus
    Indicates that an entity is associated with a particular operational or condition status as a unit.
  • D. hasSingle chosen
    Indicates that an entity possesses exactly one instance of a specified related entity or attribute.
  • E. isCompleteOn
    Indicates that an activity, task, or process has been fully finished or achieved by a specific point in time or on a specific date.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdec9f9c8190b4bac675b7588211 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d961ae493481908f82e0d05dce20bd completed April 10, 2026, 8:46 p.m.
PD Predicate disambiguation batch_69d960b47130819097e1162ed4fc993a completed April 10, 2026, 8:42 p.m.
Created at: April 9, 2026, 5:17 p.m.