Triple

T12638989
Position Surface form Disambiguated ID Type / Status
Subject Aran Valley E301840 entity
Predicate hasTransportLink P1298 FINISHED
Object Vielha tunnel E296952 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vielha tunnel | Statement: [Aran Valley, hasTransportLink, Vielha tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vielha tunnel
Context triple: [Aran Valley, hasTransportLink, Vielha tunnel]
  • A. Vielha Tunnel chosen
    Vielha Tunnel is a major road tunnel in the central Pyrenees that provides a key transport link connecting the Val d’Aran with the rest of Catalonia and Spain.
  • B. Ogarrio Tunnel
    Ogarrio Tunnel is a historic, narrow mountain tunnel in San Luis Potosí, Mexico, that serves as the primary vehicular entrance to the former silver-mining town of Real de Catorce.
  • C. Bielsa–Aragnouet tunnel
    The Bielsa–Aragnouet tunnel is a road tunnel through the central Pyrenees that provides a key transboundary link between Spain and France.
  • D. Albula Tunnel
    The Albula Tunnel is a historic Swiss railway tunnel in the Alps, renowned for its engineering significance and role in the UNESCO-listed Albula/Bernina railway line.
  • E. Rebouças Tunnel
    Rebouças Tunnel is one of Rio de Janeiro’s main road tunnels, linking the South Zone to other central areas and significantly easing urban traffic flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdec9f9c8190b4bac675b7588211 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d961499de08190bdba66ca40b021be completed April 10, 2026, 8:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69f668754acc8190b5585dbd35387867 completed May 2, 2026, 9:11 p.m.
Created at: April 9, 2026, 5:16 p.m.