Triple

T12612723
Position Surface form Disambiguated ID Type / Status
Subject The Jitterbug E301166 entity
Predicate statusInFinalFilm P83430 FINISHED
Object cut LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: cut | Statement: [The Jitterbug, statusInFinalFilm, cut]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: statusInFinalFilm
Context triple: [The Jitterbug, statusInFinalFilm, cut]
  • A. statusAtEndOfFilm chosen
    Indicates the condition or situation an entity is in when the film concludes.
  • B. statusInFirstFilm
    Indicates the role, condition, or situation an entity has in its first film appearance.
  • C. statusAfterFirstFilm
    Indicates the status or condition of an entity immediately following the release or completion of its first film.
  • D. finalFilmBy
    Indicates that a given film is the last movie directed, produced, or otherwise primarily created by a particular person or entity in their career or filmography.
  • E. endedWithFilm
    Indicates that an event, series, or process concluded with the showing, release, or occurrence of a particular film.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdeaf49c8190b13800111fa77ea3 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d9617b07ec8190b714f04ae6654060 completed April 10, 2026, 8:45 p.m.
PD Predicate disambiguation batch_69d960b195108190ac25bd95e644ace4 completed April 10, 2026, 8:42 p.m.
Created at: April 9, 2026, 5:12 p.m.