Triple
T1258908
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bureau of Reclamation |
E12453
|
entity |
| Predicate | notableProject |
P4
|
FINISHED |
| Object |
Fryingpan–Arkansas Project
The Fryingpan–Arkansas Project is a major U.S. water diversion and storage system in Colorado that transfers water from the Western Slope to the Arkansas River Basin for irrigation, municipal use, and hydroelectric power.
|
E147679
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fryingpan–Arkansas Project | Statement: [Bureau of Reclamation, notableProject, Fryingpan–Arkansas Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Fryingpan–Arkansas Project Context triple: [Bureau of Reclamation, notableProject, Fryingpan–Arkansas Project]
-
A.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
-
B.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
C.
Central Arizona Project
The Central Arizona Project is a major aqueduct system that transports Colorado River water hundreds of miles to supply cities, industries, and agriculture in central and southern Arizona.
-
D.
McNary Dam
McNary Dam is a large hydroelectric dam and navigation lock complex on the Columbia River in the Pacific Northwest of the United States.
-
E.
Red Rock Dam
Red Rock Dam is a large flood-control and hydroelectric dam on the Des Moines River in central Iowa, forming Lake Red Rock as the state’s largest reservoir.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Fryingpan–Arkansas Project Triple: [Bureau of Reclamation, notableProject, Fryingpan–Arkansas Project]
Generated description
The Fryingpan–Arkansas Project is a major U.S. water diversion and storage system in Colorado that transfers water from the Western Slope to the Arkansas River Basin for irrigation, municipal use, and hydroelectric power.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Fryingpan–Arkansas Project Target entity description: The Fryingpan–Arkansas Project is a major U.S. water diversion and storage system in Colorado that transfers water from the Western Slope to the Arkansas River Basin for irrigation, municipal use, and hydroelectric power.
-
A.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
-
B.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
C.
Central Arizona Project
The Central Arizona Project is a major aqueduct system that transports Colorado River water hundreds of miles to supply cities, industries, and agriculture in central and southern Arizona.
-
D.
McNary Dam
McNary Dam is a large hydroelectric dam and navigation lock complex on the Columbia River in the Pacific Northwest of the United States.
-
E.
Red Rock Dam
Red Rock Dam is a large flood-control and hydroelectric dam on the Des Moines River in central Iowa, forming Lake Red Rock as the state’s largest reservoir.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4933352e08190ac617291985e76c0 |
completed | March 1, 2026, 7:27 p.m. |
| NER | Named-entity recognition | batch_69a4bfc3a2848190891e73b351019d5b |
completed | March 1, 2026, 10:37 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69acacb3bf588190a6d042a01dfa31e5 |
completed | March 7, 2026, 10:54 p.m. |
| NEDg | Description generation | batch_69acad20da088190a3b55a5d46e8d951 |
completed | March 7, 2026, 10:56 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69acae0392fc8190b644f4b233bbc3ff |
completed | March 7, 2026, 11 p.m. |
Created at: March 1, 2026, 7:50 p.m.