Triple

T12587161
Position Surface form Disambiguated ID Type / Status
Subject Stallingborough E300494 entity
Predicate hasRoadAccessVia P4067 FINISHED
Object A180 road NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A180 road | Statement: [Stallingborough, hasRoadAccessVia, A180 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A180 road
Context triple: [Stallingborough, hasRoadAccessVia, A180 road]
  • A. A180 road chosen
    The A180 road is a major primary route in Lincolnshire, England, linking the M180 motorway to the port town of Grimsby and serving as a key access corridor to the Humber ports.
  • B. A189 road
    The A189 road is a major route in North East England that connects Ashington and surrounding areas to key coastal and urban destinations, including Newcastle upon Tyne.
  • C. A18 road
    The A18 road is a major route in Lincolnshire, England, linking the town of Laceby and surrounding areas to the wider regional road network.
  • D. A148 road
    The A148 road is a primary route in Norfolk, England, running between King's Lynn and Cromer and serving towns including Fakenham.
  • E. A128 road
    The A128 road is a primary route in Essex, England, connecting several towns and villages between Brentwood and Tilbury.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bde87b648190bcd0266e9efde098 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d954bbe72c8190aa11090bb6b480c9 completed April 10, 2026, 7:51 p.m.
Created at: April 9, 2026, 5:05 p.m.