Triple

T12585181
Position Surface form Disambiguated ID Type / Status
Subject 1947 Roswell UFO incident E300436 entity
Predicate hasLaterExplanationDetail P59295 FINISHED
Object Project Mogul high-altitude balloon train E991719 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Project Mogul high-altitude balloon train | Statement: [1947 Roswell UFO incident, hasLaterExplanationDetail, Project Mogul high-altitude balloon train]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Project Mogul high-altitude balloon train
Context triple: [1947 Roswell UFO incident, hasLaterExplanationDetail, Project Mogul high-altitude balloon train]
  • A. Project Mogul balloon chosen
    Project Mogul balloon was a top-secret U.S. military high-altitude balloon program designed to detect Soviet nuclear tests, later cited as the official explanation for the debris found in the 1947 Roswell incident.
  • B. Auguste Piccard high-altitude balloon gondolas
    Auguste Piccard high-altitude balloon gondolas were pioneering pressurized cabins designed for stratospheric balloon flights, enabling some of the earliest scientific explorations of the upper atmosphere.
  • C. X-10 Project
    The X-10 Project was an early Manhattan Project initiative that built and operated one of the first large-scale nuclear reactors at Oak Ridge, Tennessee, to produce plutonium for atomic research and weapon development.
  • D. Northrop HL-10
    The Northrop HL-10 was a NASA experimental lifting-body aircraft developed in the 1960s to study unpowered reentry and landing characteristics that informed the design of future spacecraft like the Space Shuttle.
  • E. Pilotless Aircraft Research Station
    The Pilotless Aircraft Research Station was an early U.S. rocket and missile testing range that evolved into today’s Wallops Flight Facility, a key NASA center for suborbital and aeronautical research.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasLaterExplanationDetail
Context triple: [1947 Roswell UFO incident, hasLaterExplanationDetail, Project Mogul high-altitude balloon train]
  • A. laterExplained chosen
    Indicates that an earlier event, statement, or situation is clarified or made understandable by information provided at a subsequent time.
  • B. mustExplain
    Indicates that one entity is obligated to provide a clarification, justification, or detailed account to another entity.
  • C. hasEventDetail
    Indicates that an event is associated with additional descriptive information or specific attributes that further characterize it.
  • D. clarifiesThat
    Indicates that one entity explains or makes another entity more understandable by removing ambiguity or confusion about it.
  • E. revealedAfter
    Indicates that one piece of information, event, or state becomes known or disclosed only subsequent to another specified point in time or condition.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bde87b648190bcd0266e9efde098 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d954e6e20481908bca684c4b497c48 completed April 10, 2026, 7:52 p.m.
NED1 Entity disambiguation (via context triple) batch_69f668656d5c819098f9824febf79712 completed May 2, 2026, 9:11 p.m.
PD Predicate disambiguation batch_69d95416cbd88190b2c65196162349bc completed April 10, 2026, 7:48 p.m.
Created at: April 9, 2026, 5:04 p.m.