Triple
T12581270
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ravensbrück concentration camp |
E300341
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | women's concentration camp |
C4860
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: women's concentration camp Context triple: [Ravensbrück concentration camp, instanceOf, women's concentration camp]
-
A.
prisoner-of-war camp
A prisoner-of-war camp is a secured facility established by a military force to detain captured enemy combatants under the rules and conditions of armed conflict.
-
B.
German prisoner-of-war camp system
The German prisoner-of-war camp system was a network of military-run facilities in Nazi Germany and occupied territories designed to detain, control, and exploit captured enemy combatants under varying conditions that often violated international law.
-
C.
Nazi death marches
Nazi death marches were forced evacuations of concentration camp prisoners on brutal, often lethal marches near the end of World War II, intended to prevent their liberation and conceal evidence of Nazi atrocities.
-
D.
Holocaust survivors
Individuals who endured and lived through the systematic persecution and genocide carried out by Nazi Germany and its collaborators during the Holocaust, often bearing profound physical, emotional, and psychological scars.
-
E.
forced labor camp
chosen
A forced labor camp is a detention facility where individuals are confined and compelled to work under coercion, often in harsh and abusive conditions, without the freedom to leave or refuse.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bde87b648190bcd0266e9efde098 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:02 p.m.