Triple

T12573973
Position Surface form Disambiguated ID Type / Status
Subject SCADA systems E270789 entity
Predicate commonlyUsesProtocol P64035 FINISHED
Object IEC 61850 E6439 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC 61850 | Statement: [SCADA systems, commonlyUsesProtocol, IEC 61850]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC 61850
Context triple: [SCADA systems, commonlyUsesProtocol, IEC 61850]
  • A. IEC 61850 chosen
    IEC 61850 is an international standard that defines communication protocols and data models for automation, protection, and control systems in electrical substations and power utility networks.
  • B. IEC 60870
    IEC 60870 is an international standard defining protocols for telecontrol and supervisory control and data acquisition (SCADA) systems in electrical power and industrial automation.
  • C. IEC 61970
    IEC 61970 is an international standard that defines a common information model and interfaces for energy management system application programming interfaces in electric power systems.
  • D. IEC 60870‑5‑103
    IEC 60870‑5‑103 is an international communication protocol standard used for telecontrol of protection equipment and substation control systems in electrical power networks.
  • E. IEC 60870‑5‑101
    IEC 60870‑5‑101 is an international standard defining basic telecontrol communication protocols for monitoring and controlling electrical power systems over serial links.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bde87b648190bcd0266e9efde098 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d960c2e5b88190a7cc16002b218d8a completed April 10, 2026, 8:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69f65595826081908035655f7930f55a completed May 2, 2026, 7:50 p.m.
Created at: April 9, 2026, 4:42 p.m.