Triple

T12572030
Position Surface form Disambiguated ID Type / Status
Subject Linthouse E295625 entity
Predicate hasNearbyMotorway P385 FINISHED
Object M8 motorway E8866 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M8 motorway | Statement: [Linthouse, hasNearbyMotorway, M8 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M8 motorway
Context triple: [Linthouse, hasNearbyMotorway, M8 motorway]
  • A. M8 motorway chosen
    The M8 motorway is a major Scottish highway linking the cities of Glasgow and Edinburgh and serving as a key east–west transport corridor across the Central Belt.
  • B. M8 motorway
    The M8 motorway is a major Irish highway linking Cork to Dublin, forming a key part of the country’s primary inter-urban road network.
  • C. M7 motorway
    The M7 motorway is a major Hungarian highway that links Budapest with Lake Balaton and continues toward the Croatian border, serving as a key route in southwestern Hungary.
  • D. M7 motorway
    The M7 motorway is a major Irish route connecting Dublin with Limerick and serving as a key part of the country’s primary east–west transport corridor.
  • E. M9 motorway
    The M9 motorway is a major Scottish highway connecting Edinburgh to Stirling and the Highlands, serving as a key transport route through central Scotland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9cac2c81908e8a7bed82d1e21d completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d954a52c788190beac128a97e34dc1 completed April 10, 2026, 7:51 p.m.
NED1 Entity disambiguation (via context triple) batch_69fffee0ff948190911c02f6e50ea2bc completed May 10, 2026, 3:43 a.m.
Created at: April 8, 2026, 11:50 p.m.