Triple

T12562749
Position Surface form Disambiguated ID Type / Status
Subject McMillan Plan E295389 entity
Predicate instanceOf P0 FINISHED
Object city beautification plan C6939 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: city beautification plan
Context triple: [McMillan Plan, instanceOf, city beautification plan]
  • A. town plan
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. urban design project chosen
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • D. cityscape painting
    A cityscape painting is an artistic depiction of an urban environment, focusing on buildings, streets, and city life to capture the atmosphere and character of a city.
  • E. city planner
    A city planner is a professional who designs, organizes, and regulates the use of urban space to balance social, economic, environmental, and infrastructural needs for sustainable community development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9cac2c81908e8a7bed82d1e21d completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 11:48 p.m.