Triple
T12562749
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | McMillan Plan |
E295389
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | city beautification plan |
C6939
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: city beautification plan Context triple: [McMillan Plan, instanceOf, city beautification plan]
-
A.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
urban design project
chosen
An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
-
D.
cityscape painting
A cityscape painting is an artistic depiction of an urban environment, focusing on buildings, streets, and city life to capture the atmosphere and character of a city.
-
E.
city planner
A city planner is a professional who designs, organizes, and regulates the use of urban space to balance social, economic, environmental, and infrastructural needs for sustainable community development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ad9cac2c81908e8a7bed82d1e21d |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 11:48 p.m.