Triple

T12552786
Position Surface form Disambiguated ID Type / Status
Subject ASTM C33 E300136 entity
Predicate instanceOf P0 FINISHED
Object construction material standard C2408 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction material standard
Context triple: [ASTM C33, instanceOf, construction material standard]
  • A. construction material
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • B. cement standard
    A cement standard is a defined specification or guideline that establishes the required properties, performance criteria, and testing methods for cement to ensure quality, safety, and consistency in construction applications.
  • C. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • D. materials specification chosen
    A materials specification defines the required types, properties, standards, and quality criteria for materials to be used in a product, component, or construction.
  • E. construction technique
    A construction technique is a specific method or process used to assemble materials and components into a built structure safely, efficiently, and according to design requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada707008190aaec1238117c9379 completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:58 p.m.