Triple

T12532357
Position Surface form Disambiguated ID Type / Status
Subject Tarnowskie Góry Lead-Silver-Zinc Mine E299600 entity
Predicate instanceOf P0 FINISHED
Object zinc mine C21071 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: zinc mine
Context triple: [Tarnowskie Góry Lead-Silver-Zinc Mine, instanceOf, zinc mine]
  • A. copper mine
    A copper mine is an industrial site where copper ore is extracted from the earth, processed, and refined for use in manufacturing and construction.
  • B. lead and zinc mining area chosen
    A lead and zinc mining area is a geographic region where lead and zinc ores are extracted, processed, and often associated with related industrial and environmental activities.
  • C. silver mine
    A silver mine is an industrial site where silver-bearing ore is extracted from the earth, processed, and refined into usable silver.
  • D. molybdenum mine
    A molybdenum mine is an industrial site where molybdenum-bearing ores are extracted, processed, and refined for use in steel alloys, catalysts, and high-temperature applications.
  • E. tin mine
    A tin mine is an excavation or system of workings where tin ore is extracted from the earth for processing and metal production.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada5cdd48190860d9ce30aff69be completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:57 p.m.