Triple
T12532305
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Historic Centre of Wrocław |
E299599
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban cultural landscape |
C14404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban cultural landscape Context triple: [Historic Centre of Wrocław, instanceOf, urban cultural landscape]
-
A.
urban ensemble
chosen
An urban ensemble is a cohesive grouping of buildings, public spaces, and infrastructure whose combined form, function, and character create a distinct, perceivable urban identity.
-
B.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
C.
urban public space
An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
-
D.
urban skyline
An urban skyline is the distinctive outline of a city formed by the arrangement and silhouette of its buildings and structures against the sky.
-
E.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada5cdd48190860d9ce30aff69be |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:57 p.m.