Triple

T12523371
Position Surface form Disambiguated ID Type / Status
Subject Danbury, Essex E299374 entity
Predicate roadJunctionOf P6234 FINISHED
Object A414 road NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A414 road | Statement: [Danbury, Essex, roadJunctionOf, A414 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A414 road
Context triple: [Danbury, Essex, roadJunctionOf, A414 road]
  • A. A414 road chosen
    The A414 road is a major route in southern England that connects towns such as Hemel Hempstead, St Albans, and Harlow across Hertfordshire and Essex.
  • B. A4144 road
    The A4144 road is a key route in Oxford, England, connecting the city centre with the southern and western suburbs and linking into the Oxford ring road.
  • C. A4142 road
    The A4142 road is a major route in Oxford, England, forming much of the city’s eastern and southern ring road and carrying significant local and through traffic.
  • D. A417 road
    The A417 road is a major route in southern England that connects towns such as Wantage with larger regional and national road networks.
  • E. A41 road
    The A41 road is a major trunk route in England that runs between London and Birkenhead, serving as an important link through the Midlands and connecting with several key motorways.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada5cdd48190860d9ce30aff69be completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d9545c2aa081908e8a5a94d30e23eb completed April 10, 2026, 7:49 p.m.
Created at: April 8, 2026, 9:57 p.m.