Triple

T12506120
Position Surface form Disambiguated ID Type / Status
Subject cantons of Bern, Fribourg, Vaud, Neuchâtel E298951 entity
Predicate sharesTransportCorridor P59961 FINISHED
Object Swiss Plateau transport axis E84083 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Swiss Plateau transport axis | Statement: [cantons of Bern, Fribourg, Vaud, Neuchâtel, sharesTransportCorridor, Swiss Plateau transport axis]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Swiss Plateau transport axis
Context triple: [cantons of Bern, Fribourg, Vaud, Neuchâtel, sharesTransportCorridor, Swiss Plateau transport axis]
  • A. Basel–Mulhouse–Freiburg transport corridor
    The Basel–Mulhouse–Freiburg transport corridor is a major transnational hub in the Upper Rhine region that integrates road, rail, and air links between France, Switzerland, and Germany around the tri-city area.
  • B. Gotthard route
    The Gotthard route is a major north–south trans-Alpine transport corridor in Switzerland, linking central Europe with Italy via road and rail tunnels through the Gotthard massif.
  • C. Swiss motorway network chosen
    The Swiss motorway network is a dense, high-quality system of national expressways that links major cities and regions across Switzerland and connects the country to neighboring European road networks.
  • D. Lausanne–Renens–Epalinges corridor
    The Lausanne–Renens–Epalinges corridor is a key urban axis in the Lausanne metropolitan area that links the city center with its western suburb Renens and northeastern suburb Epalinges, serving as a major public transport and development spine.
  • E. Schweizertrakt
    Schweizertrakt is a building wing in Austria’s Schönbrunn Palace complex, historically used as residential quarters and noted for its Baroque architecture.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: sharesTransportCorridor
Context triple: [cantons of Bern, Fribourg, Vaud, Neuchâtel, sharesTransportCorridor, Swiss Plateau transport axis]
  • A. transportCorridor
    Indicates a route or pathway used to move people, goods, or resources between locations.
  • B. shareTransportInfrastructure chosen
    Indicates that multiple entities make joint use of the same transport infrastructure facilities or systems.
  • C. transportationCorridorType
    Indicates the specific kind or classification of a transportation corridor (such as road, rail, or waterway) that characterizes how the route is used for movement or transit.
  • D. formsTransportCorridorBetween
    Indicates that something creates or constitutes a transportation link or route connecting two locations or entities.
  • E. locatedInTransportCorridor
    Indicates that an entity is situated within a designated transport corridor used for the movement of people or goods.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada4cd388190ae3bbf83ff87057a completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d94dfddf38819099263b8b1e804736 completed April 10, 2026, 7:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69f64bb5af708190b3786da334c3bf23 completed May 2, 2026, 7:08 p.m.
PD Predicate disambiguation batch_69d94d43b7008190af2648fe09fd6d23 completed April 10, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:57 p.m.