Triple
T12493234
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | USNS Bob Hope (T-AKR-300) |
E298616
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roll-on/roll-off ship |
C3889
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roll-on/roll-off ship Context triple: [USNS Bob Hope (T-AKR-300), instanceOf, roll-on/roll-off ship]
-
A.
cargo vessel
chosen
A cargo vessel is a large ship designed to transport goods and materials across bodies of water, often over long international routes.
-
B.
Jumbo Mark II-class ferry
The Jumbo Mark II-class ferry is a large, double-ended passenger and vehicle ferry designed for high-capacity, short-distance routes, featuring multiple vehicle decks and extensive passenger amenities.
-
C.
ocean liner
An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
-
D.
Liberty ship
A Liberty ship is a type of mass-produced World War II cargo vessel built by the United States to quickly transport war materials and goods across the oceans.
-
E.
troopship
A troopship is a vessel specifically designed or adapted to transport large numbers of soldiers and their equipment, typically to and from combat zones.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada377208190a36011199a4d8558 |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:56 p.m.