Triple

T12489287
Position Surface form Disambiguated ID Type / Status
Subject Charing Cross, Euston and Hampstead Railway E298519 entity
Predicate instanceOf P0 FINISHED
Object deep-level tube railway C31537 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: deep-level tube railway
Context triple: [Charing Cross, Euston and Hampstead Railway, instanceOf, deep-level tube railway]
  • A. deep-level tube stock
    Deep-level tube stock is a type of railway rolling stock specifically designed for small-diameter, deep-bored tunnels, typically featuring narrow, cylindrical car bodies and high-performance traction suited to steep gradients and tight curves.
  • B. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • C. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • D. maglev railway line
    A maglev railway line is a transportation route equipped with magnetic levitation and guidance systems that enable high-speed, low-friction train travel along a dedicated track.
  • E. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada377208190a36011199a4d8558 completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:56 p.m.