Triple
T12478957
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Delta hydrologic region |
E298252
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydrologic region |
C31520
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydrologic region Context triple: [Delta hydrologic region, instanceOf, hydrologic region]
-
A.
hydrological system
A hydrological system is the interconnected network of water storage and movement through the atmosphere, land, and water bodies, driven by processes such as precipitation, evaporation, infiltration, and runoff.
-
B.
drainage basin
A drainage basin is a land area where all precipitation collects and drains off into a common outlet, such as a river, lake, or ocean.
-
C.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
-
D.
watershed
A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
-
E.
river basin district
A river basin district is a designated geographical area comprising one or more neighboring river basins, including their associated groundwater and coastal waters, managed as a single unit for integrated water resources planning and protection.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada377208190a36011199a4d8558 |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:56 p.m.