Triple
T12478860
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Georgia State Route 515 |
E298249
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object |
SR 515
SR 515 is a major north–south state highway in northern Georgia that serves as a key corridor through the Appalachian region and part of the Appalachian Development Highway System.
|
E987132
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 515 | Statement: [Georgia State Route 515, alsoKnownAs, SR 515]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SR 515 Context triple: [Georgia State Route 515, alsoKnownAs, SR 515]
-
A.
SR 518
SR 518 is a short state highway in Washington that connects Seattle–Tacoma International Airport to major routes like I-5 and I-405.
-
B.
SR 51
SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
-
C.
SR 502
SR 502 is a state highway in New Mexico that serves as a key route connecting Los Alamos to other major roads in the region.
-
D.
SR 535
SR 535 is a state highway designation commonly used in the United States for a specific numbered route within a state's road network.
-
E.
SR 525
SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 515 Triple: [Georgia State Route 515, alsoKnownAs, SR 515]
Generated description
SR 515 is a major north–south state highway in northern Georgia that serves as a key corridor through the Appalachian region and part of the Appalachian Development Highway System.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: SR 515 Target entity description: SR 515 is a major north–south state highway in northern Georgia that serves as a key corridor through the Appalachian region and part of the Appalachian Development Highway System.
-
A.
SR 518
SR 518 is a short state highway in Washington that connects Seattle–Tacoma International Airport to major routes like I-5 and I-405.
-
B.
SR 51
SR 51 is a major north–south freeway in the Phoenix, Arizona metropolitan area that connects downtown Phoenix with its northeastern suburbs.
-
C.
SR 502
SR 502 is a state highway in New Mexico that serves as a key route connecting Los Alamos to other major roads in the region.
-
D.
SR 535
SR 535 is a state highway designation commonly used in the United States for a specific numbered route within a state's road network.
-
E.
SR 525
SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada377208190a36011199a4d8558 |
completed | April 8, 2026, 7:33 p.m. |
| NER | Named-entity recognition | batch_69d94dcdcd3c81908ad29145db241408 |
completed | April 10, 2026, 7:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f64ba5efc881909784037b95f7bbe3 |
completed | May 2, 2026, 7:08 p.m. |
| NEDg | Description generation | batch_69f64ce0ca288190bbbcb5459f914c19 |
completed | May 2, 2026, 7:13 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69f64df6488481909dea8387e7000d15 |
completed | May 2, 2026, 7:18 p.m. |
Created at: April 8, 2026, 9:56 p.m.