Triple
T12475579
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | California electrical grid |
E298167
|
entity |
| Predicate | regulatoryAuthority |
P4784
|
FINISHED |
| Object | North American Electric Reliability Corporation |
E386063
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North American Electric Reliability Corporation | Statement: [California electrical grid, regulatoryAuthority, North American Electric Reliability Corporation]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North American Electric Reliability Corporation Context triple: [California electrical grid, regulatoryAuthority, North American Electric Reliability Corporation]
-
A.
North American Electric Reliability Corporation
chosen
The North American Electric Reliability Corporation (NERC) is a nonprofit regulatory authority responsible for developing and enforcing reliability standards for the bulk power system across North America.
-
B.
Western Electricity Coordinating Council
The Western Electricity Coordinating Council is a regional reliability organization that oversees and coordinates the safe, reliable operation of the bulk electric power system across the Western Interconnection in North America.
-
C.
PJM Interconnection
PJM Interconnection is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity across parts of the eastern United States, operating one of the world’s largest competitive power markets.
-
D.
New York Independent System Operator
The New York Independent System Operator (NYISO) is the nonprofit organization responsible for managing New York State’s electric grid and administering its wholesale electricity markets.
-
E.
American Public Power Association
The American Public Power Association is a national trade organization that represents and advocates for the interests of community-owned, not-for-profit electric utilities in the United States.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada377208190a36011199a4d8558 |
completed | April 8, 2026, 7:33 p.m. |
| NER | Named-entity recognition | batch_69d94dcb194c81908b5e0320ddfd463c |
completed | April 10, 2026, 7:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f63f25462881908dccb831b474875d |
completed | May 2, 2026, 6:15 p.m. |
Created at: April 8, 2026, 9:56 p.m.