Triple

T12475570
Position Surface form Disambiguated ID Type / Status
Subject Devil Canyon Afterbay E298166 entity
Predicate projectComponentOf P33189 FINISHED
Object California Aqueduct East Branch Extension E64323 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: California Aqueduct East Branch Extension | Statement: [Devil Canyon Afterbay, projectComponentOf, California Aqueduct East Branch Extension]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: California Aqueduct East Branch Extension
Context triple: [Devil Canyon Afterbay, projectComponentOf, California Aqueduct East Branch Extension]
  • A. California Aqueduct chosen
    The California Aqueduct is a major man-made water conveyance system in California that transports water hundreds of miles from the state’s northern regions to its drier central and southern areas.
  • B. South Bay Aqueduct
    South Bay Aqueduct is a major California water conveyance facility that transports water from the State Water Project to communities in the southern San Francisco Bay Area.
  • C. Los Angeles Aqueduct
    The Los Angeles Aqueduct is a major early-20th-century water conveyance system that transports water from California’s Owens Valley to the city of Los Angeles, profoundly shaping the region’s growth and sparking enduring environmental and political controversies.
  • D. Colorado River Aqueduct
    The Colorado River Aqueduct is a major water conveyance system that transports Colorado River water across the desert to supply Southern California’s cities and agricultural areas.
  • E. Coastal Branch of the California Aqueduct
    The Coastal Branch of the California Aqueduct is a major conveyance facility of California’s State Water Project that delivers imported water from the Central Valley to coastal communities in San Luis Obispo and Santa Barbara counties.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: projectComponentOf
Context triple: [Devil Canyon Afterbay, projectComponentOf, California Aqueduct East Branch Extension]
  • A. parentProject chosen
    Indicates that one project serves as the direct higher-level or containing project in relation to another project.
  • B. projectModel
    Indicates a relationship where one entity serves as a model, template, or representation for a project or projected outcome involving another entity.
  • C. projectsInto
    Indicates that one entity extends or maps its form, structure, or influence into another space, domain, or entity.
  • D. componentFrom
    Indicates that one entity is derived from, produced by, or originates as a component of another entity.
  • E. plannedComponent
    Indicates that one entity is intended or scheduled to serve as a component or part of another entity in a planned or future configuration.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada377208190a36011199a4d8558 completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d94e626dbc8190ac7dcdb542ba9b0c completed April 10, 2026, 7:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69f65ea9024081908c800f6a5afc149e completed May 2, 2026, 8:29 p.m.
PD Predicate disambiguation batch_69d94d3f701c81909dd0e00251ac8553 completed April 10, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:56 p.m.