Triple
T12472997
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Municipal Pier 9 |
E298106
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | redeveloped public space |
C14789
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: redeveloped public space Context triple: [Municipal Pier 9, instanceOf, redeveloped public space]
-
A.
urban public space
An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
-
B.
privately owned public space
A privately owned public space is an area of land or a building that is owned and managed by a private entity but legally required or designated to be accessible for public use.
-
C.
former public square
chosen
A former public square is an open urban space that once served as a central gathering or civic area but has since been repurposed, redeveloped, or lost its original public function.
-
D.
urban regeneration area
An urban regeneration area is a designated part of a city targeted for coordinated physical, economic, social, and environmental improvements to reverse decline and promote sustainable development.
-
E.
open space park
An open space park is a large, predominantly undeveloped public area preserved for recreation, natural habitat, and scenic enjoyment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada270808190b1a2b2e7b02bb426 |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:56 p.m.