Triple
T12469773
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pwll Du quarries |
E298022
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | limestone quarry complex |
C31503
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: limestone quarry complex Context triple: [Pwll Du quarries, instanceOf, limestone quarry complex]
-
A.
sandstone quarry
A sandstone quarry is an open-pit excavation site where sandstone rock is extracted from the earth for use in construction, architecture, and industrial applications.
-
B.
granite quarry
A granite quarry is an open-pit site where granite rock is extracted from the earth through drilling, cutting, and blasting for use in construction and architectural applications.
-
C.
tuff quarry
A tuff quarry is an excavation site where consolidated volcanic ash (tuff) is extracted for use as building stone, aggregate, or raw material in construction and industry.
-
D.
slate quarry
A slate quarry is an open excavation site where slate rock is extracted from the earth for use in roofing, flooring, and other construction or decorative applications.
-
E.
fossil quarry
A fossil quarry is a designated excavation site where paleontologists systematically uncover, extract, and study preserved remains or traces of ancient organisms embedded in rock layers.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada270808190b1a2b2e7b02bb426 |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:56 p.m.