Triple

T12442943
Position Surface form Disambiguated ID Type / Status
Subject Coolgardie–Esperance Highway E297320 entity
Predicate hasJunctionWith P1018 FINISHED
Object Eyre Highway E308495 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eyre Highway | Statement: [Coolgardie–Esperance Highway, hasJunctionWith, Eyre Highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eyre Highway
Context triple: [Coolgardie–Esperance Highway, hasJunctionWith, Eyre Highway]
  • A. Eyre Highway chosen
    Eyre Highway is a major sealed road crossing the Nullarbor Plain and linking Western Australia with South Australia as part of Australia’s primary east–west transport route.
  • B. Stuart Highway
    Stuart Highway is a major Australian highway that runs through the country’s central interior, linking the south and north coasts across the Outback.
  • C. Mallee Highway
    The Mallee Highway is a major rural road in South Australia and Victoria that links a series of small agricultural communities across the Mallee region.
  • D. Goldfields Highway
    Goldfields Highway is a major road in Western Australia that connects the mining city of Kalgoorlie with other towns across the Goldfields region.
  • E. Glenn Highway
    Glenn Highway is a primary roadway in Alaska that connects the city of Anchorage with interior regions of the state, serving as a key transportation corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada166c48190b902972cd2408fa3 completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d94d8fd9848190a83410353d88ea8d completed April 10, 2026, 7:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6e256fe408190bd40b62eb51b6ef9 completed May 3, 2026, 5:51 a.m.
Created at: April 8, 2026, 9:55 p.m.