Triple

T12442528
Position Surface form Disambiguated ID Type / Status
Subject Ortigas station E297311 entity
Predicate instanceOf P0 FINISHED
Object elevated rapid transit station C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: elevated rapid transit station
Context triple: [Ortigas station, instanceOf, elevated rapid transit station]
  • A. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • B. light-rail station
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • C. rapid transit depot
    A rapid transit depot is a specialized facility where urban rail vehicles are stored, inspected, maintained, and dispatched for service on a rapid transit network.
  • D. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • E. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada166c48190b902972cd2408fa3 completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:55 p.m.