Triple

T12441036
Position Surface form Disambiguated ID Type / Status
Subject Mo Chit Depot E297269 entity
Predicate instanceOf P0 FINISHED
Object BTS Skytrain facility C31466 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: BTS Skytrain facility
Context triple: [Mo Chit Depot, instanceOf, BTS Skytrain facility]
  • A. Kaohsiung MRT station
    A Kaohsiung MRT station is a designated public transit facility within the Kaohsiung Mass Rapid Transit system where passengers access, board, transfer between, and alight from metro trains and related services.
  • B. Manila MRT Line 3 station
    A Manila MRT Line 3 station is a designated stop along Metro Manila’s elevated rapid transit Line 3, providing passenger access, boarding, and alighting services within the rail network.
  • C. AeroTrain station
    An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
  • D. Busan Metro station
    A Busan Metro station is a designated facility along the Busan subway network where trains stop to allow passengers to board, alight, and transfer between lines or other modes of transportation.
  • E. Manila LRT Line 2 station
    A Manila LRT Line 2 station is a designated passenger facility along Line 2 of the Manila Light Rail Transit system that provides platforms, ticketing, and access points for boarding and alighting trains.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada166c48190b902972cd2408fa3 completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:55 p.m.