Triple

T12427130
Position Surface form Disambiguated ID Type / Status
Subject North Carolina Highway 540 E296926 entity
Predicate isPartiallyCompletedLoop P45410 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [North Carolina Highway 540, isPartiallyCompletedLoop, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isPartiallyCompletedLoop
Context triple: [North Carolina Highway 540, isPartiallyCompletedLoop, yes]
  • A. isPartially
    Indicates that one entity is included within another to some extent, but not completely or fully.
  • B. isLoop
    Indicates that something forms or behaves as a closed, repeating cycle or path that returns to its starting point.
  • C. partiallyCompleted chosen
    Indicates that an action, process, or task has been started and progressed to some extent, but has not yet been fully completed.
  • D. partOfLoopWith
    Indicates that one entity participates as a component or segment within the same loop structure as another entity.
  • E. hasPassingLoopAt
    Indicates that a railway line or track segment includes a passing loop located at a specified place or point.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada0640c81908c061d7fb3d47786 completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d94df948308190ace333230a4a3b38 completed April 10, 2026, 7:22 p.m.
PD Predicate disambiguation batch_69d94d391c548190996a8c698357f273 completed April 10, 2026, 7:19 p.m.
Created at: April 8, 2026, 9:55 p.m.