Triple
T12421426
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Panzhihua |
E296780
|
entity |
| Predicate | energyInfrastructure |
P19374
|
FINISHED |
| Object | Ertan Dam |
E859445
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ertan Dam | Statement: [Panzhihua, energyInfrastructure, Ertan Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ertan Dam Context triple: [Panzhihua, energyInfrastructure, Ertan Dam]
-
A.
Ertan Dam
chosen
Ertan Dam is a major arch dam and hydroelectric power station in Sichuan, China, known for its large installed capacity and role in regional power generation.
-
B.
Atatürk Dam
Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
-
C.
Enguri Dam
Enguri Dam is a massive arch dam in western Georgia, notable as one of the tallest concrete arch dams in the world and a key source of hydroelectric power for the region.
-
D.
Aras Dam
Aras Dam is a major hydroelectric and irrigation dam on the transboundary Aras River, playing a key role in water management and power generation in the region between Iran and the South Caucasus.
-
E.
Keban Dam
Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada0640c81908c061d7fb3d47786 |
completed | April 8, 2026, 7:33 p.m. |
| NER | Named-entity recognition | batch_69d94d702b1481909db5f5bed6292ce0 |
completed | April 10, 2026, 7:20 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f6349552fc81909fe73dea082e3a25 |
completed | May 2, 2026, 5:29 p.m. |
Created at: April 8, 2026, 9:55 p.m.