Triple

T12421426
Position Surface form Disambiguated ID Type / Status
Subject Panzhihua E296780 entity
Predicate energyInfrastructure P19374 FINISHED
Object Ertan Dam E859445 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ertan Dam | Statement: [Panzhihua, energyInfrastructure, Ertan Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ertan Dam
Context triple: [Panzhihua, energyInfrastructure, Ertan Dam]
  • A. Ertan Dam chosen
    Ertan Dam is a major arch dam and hydroelectric power station in Sichuan, China, known for its large installed capacity and role in regional power generation.
  • B. Atatürk Dam
    Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
  • C. Enguri Dam
    Enguri Dam is a massive arch dam in western Georgia, notable as one of the tallest concrete arch dams in the world and a key source of hydroelectric power for the region.
  • D. Aras Dam
    Aras Dam is a major hydroelectric and irrigation dam on the transboundary Aras River, playing a key role in water management and power generation in the region between Iran and the South Caucasus.
  • E. Keban Dam
    Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ada0640c81908c061d7fb3d47786 completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d94d702b1481909db5f5bed6292ce0 completed April 10, 2026, 7:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6349552fc81909fe73dea082e3a25 completed May 2, 2026, 5:29 p.m.
Created at: April 8, 2026, 9:55 p.m.