Triple
T12417633
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LaGuardia Tower |
E296677
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | air traffic control tower |
C31441
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: air traffic control tower Context triple: [LaGuardia Tower, instanceOf, air traffic control tower]
-
A.
race control tower
A race control tower is a centralized facility at a racing venue from which officials monitor the event, manage timing and scoring, enforce rules, and coordinate safety and communication.
-
B.
airport runway
An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
-
C.
airfield
An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
-
D.
airport authority
An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
-
E.
private aviation terminal
A private aviation terminal is a specialized airport facility that provides exclusive, streamlined services and amenities for private and corporate aircraft, their passengers, and crews.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ada0640c81908c061d7fb3d47786 |
completed | April 8, 2026, 7:33 p.m. |
Created at: April 8, 2026, 9:55 p.m.