Triple

T12403866
Position Surface form Disambiguated ID Type / Status
Subject Archer Avenue Subway E296329 entity
Predicate instanceOf P0 FINISHED
Object New York City Subway extension C24427 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: New York City Subway extension
Context triple: [Archer Avenue Subway, instanceOf, New York City Subway extension]
  • A. New York City Subway infrastructure project
    A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
  • B. New York City Subway tunnel
    A New York City Subway tunnel is an underground passageway engineered to safely guide subway trains, utilities, and related infrastructure beneath the city’s surface between stations.
  • C. New York City Subway–railroad interchange
    A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
  • D. Long Island Rail Road project
    A Long Island Rail Road project is a coordinated initiative to plan, construct, upgrade, or maintain LIRR infrastructure, services, or operations to improve rail transportation for its riders and communities.
  • E. subway line extension chosen
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9f464c81909db36d7e96e34b9e completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:55 p.m.