Triple

T12401662
Position Surface form Disambiguated ID Type / Status
Subject Ahu Vinapu E296268 entity
Predicate constructionTechniqueComparedTo P104955 FINISHED
Object Inca masonry E952890 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Inca masonry | Statement: [Ahu Vinapu, constructionTechniqueComparedTo, Inca masonry]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Inca masonry
Context triple: [Ahu Vinapu, constructionTechniqueComparedTo, Inca masonry]
  • A. Inca architecture
    Inca architecture is the sophisticated pre-Columbian building tradition of the Inca Empire, characterized by precisely cut stone masonry, trapezoidal openings, and structures harmoniously integrated into mountainous landscapes.
  • B. Inca terraces
    Inca terraces are ancient stepped agricultural platforms built into Andean mountainsides by the Inca civilization to maximize arable land and manage water and soil in steep terrain.
  • C. Inca walls chosen
    Inca walls are finely crafted stone structures built by the Inca civilization, renowned for their precisely fitted masonry that has withstood centuries of earthquakes and weathering.
  • D. Inca causeways
    Inca causeways are the elevated stone and earth roadways that formed part of the vast Inca road system, enabling efficient travel, communication, and transport across the challenging Andean terrain.
  • E. Inca bridges
    Inca bridges are traditional Andean suspension structures, often made from woven grass or fiber ropes, that enabled the Inca Empire’s road network to cross deep gorges and rivers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionTechniqueComparedTo
Context triple: [Ahu Vinapu, constructionTechniqueComparedTo, Inca masonry]
  • A. constructionMethod
    Indicates the technique or process by which something is built, assembled, or created.
  • B. constructionUsed
    Indicates that one entity was employed as a construction method, material, or component in creating or assembling another entity.
  • C. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • D. constructionBase
    Indicates that one entity serves as the foundational structure or base upon which another entity is constructed or built.
  • E. combinedConstruction
    Indicates that multiple construction elements, processes, or projects are joined or executed together as a single combined construction activity.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9f464c81909db36d7e96e34b9e completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d94e1888b48190bd750f839a26e99e completed April 10, 2026, 7:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69f63484c6808190a71d24f8ee3a7e15 completed May 2, 2026, 5:29 p.m.
PD Predicate disambiguation batch_69d94d354b488190adc83fb4f2770dd5 completed April 10, 2026, 7:19 p.m.
PDg Predicate description generation batch_69d94e15f21c8190831c9562ffdd4fda completed April 10, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:55 p.m.