Triple

T12393705
Position Surface form Disambiguated ID Type / Status
Subject American River watershed infrastructure E296061 entity
Predicate instanceOf P0 FINISHED
Object flood control system C5154 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9e653c8190b1473c860ee53dae completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:54 p.m.