Triple

T12393326
Position Surface form Disambiguated ID Type / Status
Subject Tizard Mission E296051 entity
Predicate instanceOf P0 FINISHED
Object World War II diplomatic mission C31398 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II diplomatic mission
Context triple: [Tizard Mission, instanceOf, World War II diplomatic mission]
  • A. World War II conference
    A World War II conference is a high-level diplomatic meeting held among Allied or Axis leaders during the war to coordinate military strategy, negotiate political arrangements, and shape postwar plans.
  • B. World War II resistance operation
    A World War II resistance operation is a covert, organized action conducted by underground groups in occupied territories to sabotage enemy forces, gather intelligence, and support Allied war efforts.
  • C. World War II military plan
    A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
  • D. World War II faction
    A World War II faction is a distinct political, military, or ideological group—such as a nation, alliance, or resistance movement—that organized and acted collectively to pursue its strategic objectives during the global conflict of 1939–1945.
  • E. World War II military role
    A World War II military role represents a specific set of duties, responsibilities, and functions performed by individuals or units within the armed forces of nations involved in the conflict between 1939 and 1945.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9e653c8190b1473c860ee53dae completed April 8, 2026, 7:33 p.m.
Created at: April 8, 2026, 9:54 p.m.