Triple

T12385837
Position Surface form Disambiguated ID Type / Status
Subject Soichi Noguchi E295860 entity
Predicate performedEVA P37299 FINISHED
Object STS-114 EVA-2
STS-114 EVA-2 was a spacewalk conducted during NASA’s Space Shuttle Discovery return-to-flight mission in 2005, focused on testing new safety procedures and performing maintenance and inspection tasks on the International Space Station.
E980301 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-114 EVA-2 | Statement: [Soichi Noguchi, performedEVA, STS-114 EVA-2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-114 EVA-2
Context triple: [Soichi Noguchi, performedEVA, STS-114 EVA-2]
  • A. STS-114 EVA-1
    STS-114 EVA-1 was a spacewalk conducted during NASA’s Space Shuttle Discovery return-to-flight mission in 2005, focused on testing new safety procedures and performing maintenance on the International Space Station.
  • B. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • C. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • D. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • E. STS-118
    STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-114 EVA-2
Triple: [Soichi Noguchi, performedEVA, STS-114 EVA-2]
Generated description
STS-114 EVA-2 was a spacewalk conducted during NASA’s Space Shuttle Discovery return-to-flight mission in 2005, focused on testing new safety procedures and performing maintenance and inspection tasks on the International Space Station.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-114 EVA-2
Target entity description: STS-114 EVA-2 was a spacewalk conducted during NASA’s Space Shuttle Discovery return-to-flight mission in 2005, focused on testing new safety procedures and performing maintenance and inspection tasks on the International Space Station.
  • A. STS-114 EVA-1
    STS-114 EVA-1 was a spacewalk conducted during NASA’s Space Shuttle Discovery return-to-flight mission in 2005, focused on testing new safety procedures and performing maintenance on the International Space Station.
  • B. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • C. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • D. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • E. STS-118
    STS-118 was a 2007 Space Shuttle Endeavour mission to the International Space Station that delivered and installed new station components and marked teacher-astronaut Barbara Morgan’s first spaceflight.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9e653c8190b1473c860ee53dae completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d93fbd489c819098233a111442762e completed April 10, 2026, 6:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6347816408190904ea71d2a72398f completed May 2, 2026, 5:29 p.m.
NEDg Description generation batch_69f6356c21908190b34d1324da8f8052 completed May 2, 2026, 5:33 p.m.
NED2 Entity disambiguation (via description) batch_69f63693f5c881909a9683a0c6a68739 completed May 2, 2026, 5:38 p.m.
Created at: April 8, 2026, 9:54 p.m.