Triple

T12384207
Position Surface form Disambiguated ID Type / Status
Subject A5 road E295818 entity
Predicate parallelTo P1868 FINISHED
Object M54 motorway (in parts) E519726 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M54 motorway (in parts) | Statement: [A5 road, parallelTo, M54 motorway (in parts)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M54 motorway (in parts)
Context triple: [A5 road, parallelTo, M54 motorway (in parts)]
  • A. M54 motorway chosen
    The M54 motorway is a key road in the West Midlands of England that links the M6 near Wolverhampton to Telford and provides an important route toward Shropshire and mid-Wales.
  • B. M53 motorway
    The M53 motorway is a major road in north-west England that connects the Wirral Peninsula to the M56 and the wider UK motorway network.
  • C. M45 motorway
    The M45 motorway is a short spur in England that connects the M1 motorway near Rugby to the A45, providing an alternative route toward Coventry and the West Midlands.
  • D. M40 motorway
    The M40 motorway is a major English motorway linking London to Birmingham, serving as a key route through the Midlands and the southeast of England.
  • E. M6 motorway in England
    The M6 motorway in England is a major north–south route linking the Midlands to the Scottish border, forming a key part of the United Kingdom’s primary western motorway corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ad9e653c8190b1473c860ee53dae completed April 8, 2026, 7:33 p.m.
NER Named-entity recognition batch_69d93fbc3f608190b0ee3c4f304a94db completed April 10, 2026, 6:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6347816408190904ea71d2a72398f completed May 2, 2026, 5:29 p.m.
Created at: April 8, 2026, 9:54 p.m.