Triple

T12375355
Position Surface form Disambiguated ID Type / Status
Subject Shibaura Futo E295109 entity
Predicate instanceOf P0 FINISHED
Object pier area C12386 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pier area
Context triple: [Shibaura Futo, instanceOf, pier area]
  • A. port area chosen
    A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
  • B. waterfront pier complex
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • C. oceanographic research pier
    An oceanographic research pier is a specialized coastal structure extending into the sea, equipped with instruments and facilities that allow scientists to conduct long-term, in situ studies of marine and atmospheric processes.
  • D. beach area
    A beach area is a coastal zone where land meets a body of water, typically featuring sand or pebbles and used for recreation, relaxation, and shoreline activities.
  • E. fishing pier
    A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6d8a4081908636601e69ddf262 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:54 p.m.