Triple
T12367827
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ACSES |
E294917
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | positive train control system |
C3558
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: positive train control system Context triple: [ACSES, instanceOf, positive train control system]
-
A.
train control system
chosen
A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
-
B.
railway signaling system
A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
-
C.
railway communication system
A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
-
D.
rail transportation infrastructure
Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
-
E.
named train
A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6d8a4081908636601e69ddf262 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:54 p.m.