Triple
T12366908
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Meals, Ready-to-Eat |
E294897
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | prepackaged meal |
C31357
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: prepackaged meal Context triple: [Meals, Ready-to-Eat, instanceOf, prepackaged meal]
-
A.
prepared meals brand
A prepared meals brand is a company that develops, packages, and markets ready-to-eat or easy-to-cook food products designed to offer convenient, consistent, and branded meal solutions to consumers.
-
B.
Nasi
Nasi is a conceptual class representing a rice-based dish, typically cooked or prepared in various styles and often serving as a staple or central component of a meal in many cuisines.
-
C.
main course
A main course is the central and most substantial dish in a meal, typically featuring a primary protein or hearty component and served after appetizers.
-
D.
extruded snack
An extruded snack is a processed food product made by forcing a dough-like mixture of ingredients through a shaped die under heat and pressure to create light, crunchy, and often flavored bite-sized pieces.
-
E.
dumpling
A dumpling is a small piece of dough, often filled with ingredients like meat, vegetables, or sweets, that is cooked by boiling, steaming, frying, or baking and served as a savory or sweet dish in many cuisines.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6d8a4081908636601e69ddf262 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:54 p.m.