Triple
T12342964
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wildcat Express Quad |
E294275
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | detachable quad chairlift |
C31325
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: detachable quad chairlift Context triple: [Wildcat Express Quad, instanceOf, detachable quad chairlift]
-
A.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
B.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
C.
cantilever chair
A cantilever chair is a type of chair supported by a single, continuous base that allows the seat to flex slightly, creating a suspended, floating appearance without traditional back legs.
-
D.
suspended monorail
A suspended monorail is an elevated rail transport system in which vehicles hang from a single overhead track, providing efficient, space-saving urban or interurban transit.
-
E.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6ccbec8190b09e2d357aa80064 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:53 p.m.