Triple
T12333711
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lockport Cave |
E294026
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | man-made hydraulic tunnel |
C26460
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: man-made hydraulic tunnel Context triple: [Lockport Cave, instanceOf, man-made hydraulic tunnel]
-
A.
water supply tunnel
A water supply tunnel is an underground passage constructed to convey water from its source to treatment facilities, storage reservoirs, or distribution networks, often over long distances and through challenging terrain.
-
B.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
C.
transportation tunnel
A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
-
D.
engineered waterway
chosen
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
E.
road tunnel
A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6ae0dc8190b1522a9c1c55c114 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:53 p.m.