Triple

T12319207
Position Surface form Disambiguated ID Type / Status
Subject Manila Metro Rail Transit System E293683 entity
Predicate hasLine P35 FINISHED
Object MRT Line 3 E56499 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MRT Line 3 | Statement: [Manila Metro Rail Transit System, hasLine, MRT Line 3]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MRT Line 3
Context triple: [Manila Metro Rail Transit System, hasLine, MRT Line 3]
  • A. MRT Line 3 chosen
    MRT Line 3 is a major elevated rapid transit line in Metro Manila that runs along EDSA, serving as one of the region’s primary commuter rail corridors.
  • B. MRT Line 5
    MRT Line 5 is a planned major rapid transit corridor of the Dhaka Metro Rail network intended to improve urban connectivity and reduce congestion in Bangladesh’s capital.
  • C. MRT Line 7
    MRT Line 7 is a rapid transit line under development in Metro Manila, Philippines, intended to connect Quezon City with the city of San Jose del Monte in Bulacan.
  • D. MRT Orange Line
    The MRT Orange Line is a rapid transit route in Bangkok’s Mass Rapid Transit system designed to connect key eastern and western parts of the city.
  • E. Metro Line 3
    Metro Line 3 is a major Mexico City Metro route that runs north–south across the city, connecting key residential and commercial areas including the Gustavo A. Madero borough.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6ae0dc8190b1522a9c1c55c114 completed April 8, 2026, 7:24 p.m.
NER Named-entity recognition batch_69d93f4ab1b88190979a8403a430a17c completed April 10, 2026, 6:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6346a3f34819091882004ab558347 completed May 2, 2026, 5:29 p.m.
Created at: April 8, 2026, 9:53 p.m.