Triple

T12319131
Position Surface form Disambiguated ID Type / Status
Subject Cyberpark 3 E293681 entity
Predicate instanceOf P0 FINISHED
Object planned building project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned building project
Context triple: [Cyberpark 3, instanceOf, planned building project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. building section
    A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
  • C. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • D. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • E. building society
    A building society is a member-owned financial institution that primarily offers savings accounts and mortgage lending, operating on a mutual, not-for-profit basis.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6ae0dc8190b1522a9c1c55c114 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:53 p.m.