Triple

T12311146
Position Surface form Disambiguated ID Type / Status
Subject North Nazimabad Town E293480 entity
Predicate instanceOf P0 FINISHED
Object planned locality C5974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned locality
Context triple: [North Nazimabad Town, instanceOf, planned locality]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. locality
    A locality is a geographically bounded area, such as a neighborhood, town, or district, characterized by its specific physical setting, social community, and administrative identity.
  • C. planned garden city
    A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
  • D. planned residential community chosen
    A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
  • E. planning district
    A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6a2b50819082f6aedd32ed608a completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:53 p.m.