Triple
T12305000
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Check Point Software (offices/R&D) |
E293330
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | corporate facility |
C19689
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: corporate facility Context triple: [Check Point Software (offices/R&D), instanceOf, corporate facility]
-
A.
business facility group
A business facility group is a collection of related physical or virtual business premises managed together for coordinated operations, services, or administration.
-
B.
facility
chosen
A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
-
C.
multi-purpose facility
A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
-
D.
facility management company
A facility management company is an organization that plans, operates, and maintains buildings and their services to ensure safe, efficient, and cost-effective environments for occupants and owners.
-
E.
production facility
A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6a2b50819082f6aedd32ed608a |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:53 p.m.